Number of points
Sockets, switches, lights and dedicated appliances determine the main labour scope.
Specialized renovation work
Updating electrical wiring before new finishing work.

Service
Electrical wiring is best renewed before walls and ceilings receive their final finishes. We review the existing system and plan sockets, switches, lighting and required capacity for the intended use of each room.
The scope is coordinated with applicable safety requirements and the distribution arrangement. Cables and points are checked before walls are closed and finishing begins.
Work sequence
After inspecting the property, we agree the scope, materials and work sequence so each stage is completed at the right time.
Inspect the work area and check the base or connections
Agree the solution, materials and work limits
Complete the work in the correct technical sequence
Check the result and leave the work area tidy
Costs
An accurate price follows the inspection because it depends on the property's condition and the actual scope required.
Sockets, switches, lights and dedicated appliances determine the main labour scope.
Wall material, distances and access to existing routes affect installation complexity.
The existing board and required protective devices are assessed against the new load.

Questions
It depends on the age, material, condition and expected load of the system. Old or undersized wiring may require complete renewal.
Plan them before wall finishing, once furniture, appliances and lighting positions are known.
Yes. Concealed installations should be checked before closing structures so any issue can be corrected without damaging new finishes.