Number of connections
The number of basins, showers, toilets and other fixtures determines labour and material quantities.
Specialized renovation work
Preparing, replacing and arranging plumbing connections during renovation.

Service
Plumbing work is planned before walls and floors receive their final finishes. We first confirm fixture positions, pipe routes, isolation valves and future access to important connections.
We complete the water and drainage work required for the renovation, prepare connections for basins, showers, baths, toilets or kitchen equipment and test the system after installation.
Work sequence
After inspecting the property, we agree the scope, materials and work sequence so each stage is completed at the right time.
Inspect the work area and check the base or connections
Agree the solution, materials and work limits
Complete the work in the correct technical sequence
Check the result and leave the work area tidy
Costs
An accurate price follows the inspection because it depends on the property's condition and the actual scope required.
The number of basins, showers, toilets and other fixtures determines labour and material quantities.
Hidden or hard-to-reach pipework may require additional opening and reinstatement work.
Moving fixtures requires new routes and correct drainage falls.

Questions
Often yes, when a safe water supply and correct drainage fall can be achieved. We assess this on site.
Yes, when the fixtures and components match the prepared connections. We check the required parts before installation.
After installation, we check supply, drainage and visible joints to confirm correct operation and tightness.
Contacts
Tell us what service you need, where the site is and when it would be convenient to inspect it.